Completed June 2026

CUH ED CT Scanner Extension

Type of Construction – Offsite Steel Frame Building System, LGS 

The building was assembled using a factory-made panellised system. Panels consisted of both loadbearing & non-loadbearing components which included insulation and membranes where required.  

This system accelerated the construction process and rationalized the installation on site. This was especially important in a confined site situated among numerous acute hospital departments.  

NSAI certified and fire tested as a complete assembly. 

Client

Health Service Executive

Size

900 m2
2 Storeys with Plant Room 

 

CUH ED CT Scanner Extension